Aurora Imaging Technology will be launching the Aurora Breast MRI Mobile Solution at the 2010 RSNA conference.

November 6, 2009 - Acceletronics announced here at the 51st Annual Meeting of the American Society for Radiation Oncology (ASTRO) that it will be introducing the new Theraview KV Imaging IGRT system for radiation oncology facilities.

November 6, 2009 – Nearly 4 million people nationwide suffer from cardiac arrhythmias each year, according to the 2006 U.S. Cardiac Rhythm Management Market report by Frost and Sullivan. About 2.5 million of these cases cannot be treated or controlled through medication alone.

The Carotid Intima-Media Thickness (CIMT) Screening, which maps and assesses vascular age, is one of the many easily configurable study types within the Digisonics DigiView Image Management and Reporting System.

November 6, 2009 - As the American Medical Isotopes Production Act of 2009 now heads to the U.S. Senate for approval, legislation that would create a stable and reliable supply of medical isotopes in the United States, the Society of Nuclear Medicine (SNM) applauds the U.S. House of Representatives for its passage of H.R. 3276—the American Medical Isotopes Production Act of 2009.

November 5, 2009 - Ziosoft has developed flexible workflow tools and additional clinical functionality for the Ziostation system. The Ziostation system is based on a highly scalable, true thin-client architecture that requires no proprietary or specialized hardware components.

November 5, 2009 - Shina Systems debuted its 3Di, a cloud-based advanced (3D/4D) visualization software suite that turns any Internet-enabled PC into a comprehensive image processing workstation.

November 5, 2009 - ACRIN seeks sites for the clinical trial: “A Multicenter Trial of FDG-PET/CT Staging of Head and Neck Cancer and its Impact on the N0 Neck Surgical Treatment in Head and Neck Cancer Patient” (ACRIN 6685).

November 5, 2009 - As a part of its commitment to MRI education, Merge Healthcare will support broad-based MRI workshops at RSNA 2009 by hosting 13 CADstream MRI-CAD hands-on workshops.

November 5, 2009 - Philips has signed an eight-year combined iSite PACS replacement and Xcelera deal to meet radiology and cardiology image management needs at Lakeland Regional Medical Center, a not-for-profit, 851-bed facility serving central Fla.

Subscribe Now